At the request of the Armed Forces of Ukraine, electrical installation work was performed in the five-story administrative building, namely the connection of seventeen electric boilers of 24 kW each.
Also, a 437 kW diesel generator was connected to the building.
In addition, a battery charger was installed in the generator, commissioning work was carried out, and the generator control panel was programmed